The Arkansas State Highway and Transportation Department will continue a night project to seal joints and cracks on the southbound Interstate 530 exit and entrance ramps at Highway 270 (exit 34) and Highway 63 (exit 43) on March 2, a department spokesman said.

The Arkansas State Highway and Transportation Department will continue a night project to seal joints and cracks on the southbound Interstate 530 exit and entrance ramps at Highway 270 (exit 34) and Highway 63 (exit 43) on March 2, a department spokesman said.

The work will consist of cleaning and sealing joints and cracks in the concrete pavement with a flexible joint sealant material. The ramps will remain open to traffic during the operation, but the lane width will be reduced in the work area.

The work will be be conducted between midnight and 7 a.m. March 2. The public should expect to encounter flagging operations and short delays at the exit and entrance ramps at each of these locations.

Details: Contact the District 2 highway department headquarters at 534-1612 during normal business hours.